The questions a construction project gets asked every week.
Four people, one project, and the same mountain of correspondence. Pick a question and see how K1 answers it.
Every answer on this page is a sample, on an invented project.
Project managers
Back from site at five, with a day of letters waiting.
What came in from the Engineer today?
Three letters. One is an instruction: it lowers the ceiling void on Levels 3 and 4 and asks for revised shop drawings within 14 days.1 The other two are comments on the fire-stopping submittal2 and a reminder that the monthly report is due on Thursday.3
- ENG/L/0412 · page 1
- ENG/L/0413 · page 2
- ENG/L/0414 · page 1
Has the revised cooling design been approved?
Not yet. It went in on 29 June1 and came back on 11 July marked B, approved with comments.2 The two comments on pipe routing in the plant room are still open.2
- CON/T/0221 · transmittal
- ENG/L/0398 · page 2
What did we agree about the access road at last week's progress meeting?
The Employer agreed to hand over the north access road by 20 July, a week later than the programme shows.1 The Contractor noted that this holds up the crane deliveries.1 Nothing since has confirmed the new date in writing.
- Minutes of meeting 31 · item 4.2, page 3
Contract administrators
Every notice has a date, and every date has a consequence.
Did we give notice of the late drawings, and on what date?
Yes, on 19 June, by letter CON/L/0633, which cites Sub-Clause 20.2.1.1 The drawings were due on 2 June under the accepted programme,2 so the notice went out 17 days after they were due. The contract allows 28.3
- CON/L/0633 · page 1
- Programme rev 3 · activity A1140
- Conditions of Contract · Sub-Clause 20.2.1
What has the Engineer instructed on the cooling system since June?
Two things. On 3 June, a variation raising the cooling load in Hall 1.1 On 14 June, revised design criteria to go with it.2 K1 found no later instruction on cooling.
- ENG/VI/007 · page 1
- ENG/T/0087 · transmittal
Which clause does the Engineer rely on in rejecting our request?
Sub-Clause 8.5. The Engineer's letter of 14 August says the delay was not on the critical path and so gives no entitlement to more time.1 The letter does not mention the notice of 19 June.
- ENG/L/0431 · page 2
Claims consultants
Appointed long after the events, and expected to prove every one of them.
Describe the issueThe Engineer issued the roof steel drawings eight weeks late in spring 2025, which held up the roof works.
Evidence Agent went through every letter and document on the project and found 27 that support this. The three strongest:
- 2 April 2025Programme rev 3Shows the roof steel drawings due on 2 April.
- 28 May 2025ENG/T/0079The transmittal that issued them, eight weeks later.
- 4 June 2025Minutes of meeting 26The steel subcontractor says fabrication cannot start until the drawings are approved.
You keep or remove each one. K1 then builds a dated timeline from what you kept.
Describe the issueThe Employer handed over the north access road late, so the tower crane could not be delivered when planned.
Evidence Agent found 14 documents that support this. The three strongest:
- 13 July 2025Programme rev 3Shows the access road handed over on 13 July.
- 22 July 2025Minutes of meeting 31Notes the road as not yet available.
- 29 July 2025CON/L/0688The Contractor tells the Engineer the crane delivery has been put back.
You keep or remove each one. K1 then builds a dated timeline from what you kept.
Arbitrators and experts
Two accounts of the same project, each complete only where it helps.
When did the Contractor first say the lifts would be late?
On 10 June 2025, in a letter warning that the change to the lift shaft dimensions “may delay delivery”.1 The Contractor's own order for the lifts is dated 28 May, six weeks after the date in its programme.2
- CON/L/0612 · page 1
- Purchase order 0098 · page 1
Did the Engineer respond to the notice within the time the contract allows?
The notice is dated 19 June.1 K1 found no reply before 14 August, 56 days later.2 The contract gives the Engineer 42 days.3
- CON/L/0633 · page 1
- ENG/L/0431 · page 1
- Conditions of Contract · Sub-Clause 3.7.3
Where do the two sides disagree about the date the road was handed over?
The Contractor says 27 July.1 The Engineer says 20 July.2 The minutes of the meeting held on 22 July note the road as “not yet available”.3
- CON/L/0688 · page 1
- ENG/L/0431 · page 3
- Minutes of meeting 31 · item 4.2, page 3